Updated Monday 19 Oct 2026, ~12:10 AM ET

Updated Monday 19 Oct 2026, about 12:10 AM ET (newest note first; older notes below are unchanged)

19 Oct 2026 12:10 AM ET recount (Liora, for Daniel). Recounted every cell from this page (the newest of the two board files; the published copy was 3 flips behind and is synced). 84 done (live-proven) · 34 built, not live · 13 in progress · 12 not started · 18 deferred = 161. Change since last report (81/161, 18 Oct 8:58 AM ET): +3 done (C041, C061, C133, Victoria proofs 18 Oct 10:46/11:38 AM ET, Eve flip OK 2:51 PM ET; these were already on the infra01 board but not in the published copy or the last report); C030 todo→built (catch-up: #1835 merged 3:24 PM ET, board never marked). No cell turned green this pass. Why 81 vs 59: 59 of 155 is the 12 Oct 10:33 PM ET snapshot (old signed total 155, before C156–C161 were added on 13 Oct and before the flips to 68, 79, 81, 84). 81 of 161 was the 18 Oct morning board; 84 of 161 is correct today. Merges since the board's last edit (#1828 C012 audit-wire, #1849 C130, #1863 C130 pin, #1876 C012 intake 500 fix, #1880 C130 login CSP, #1862 C032 teams headroom, #1868 C128 method pin, #1861 C012 FR56B) touch cells that were already done on earlier live proof, so no count change; their new behaviour is built, not live. Host is b3842c3d (= #1880 merge); #1862, #1868 and #1861 landed after it and wait for a host sync + probe. Open, not merged: #1903 (FR112 C012, Eve review), #1881 C095, #1882 C058, #1884 C069 (stays done on 10 Oct proof), #1883 C034 (awaiting Eve): no status change. Done means live: nothing was flipped without a proof line.

Updated Thursday 15 Oct 2026, about 3:20 PM ET (newest note first; older notes below are unchanged)

18 Oct 2026 10:05 AM ET update (Liora). 0853 launcher batch + later completions. Merged on factory-bridge main (squash pinned to verified 5/5 green heads): #1825 C071 pin → 137806b1; #1826 C062 pin → c75146ca; #1829 C077 pin → 810a1c2b; #1824 C133 people-access discoverability → 90b641b4; #1827 C134 audit-status discoverability → a482f88f; #1830 C111 pin → 05e2cc7a; #1831 C113 pin → 2d11a705; #1832 C127 pin → 7120827a. Held: #1828 C012 Daniel-path audit (Eve review before merge). Host synced to a07c9b6f by Victoria after the owner-registry check (proof office-file-server/bot-work/victoria/probes/2026-10-18b/0927_ET_PROOF_host_a07c9b6f_owner_check.md): /support and /admin links are served, but the C095 case record and C144 admin pages still lack a real-row page proof, so no flips. C133/C134 changes are built, not live until the next sync + probe. Changes: none. Cells now 81 done · 34 built, not live · 14 in progress · 14 not started · 18 deferred (161). Host PAUSED, productionWrites=false.

18 Oct 2026 9:22 AM ET update (Liora). Eve 0800 verdicts + 0747 launcher batch. C157 → done (live): Victoria proof 7:14 AM ET on host a517d106, Eve flip OK (bot-inbox/eve-to-liora/2026-10-18_0800_ET_DONE_verdicts_1815_1816_C157_flip_OK.md). Merged on factory-bridge main (squash pinned to verified green heads): #1815 C012 bot-write path (Eve APPROVE) → a87f54d7; #1822 /support discoverability (brief label C114, row C095) → 185d9b50; #1823 C144 System family mvp + /work budget → 9d8494bf; #1821 C099 test pin → 30b89b68 (main push CI green); #1816 C130 write-route auth (Eve APPROVE + test-only update after #1815) → a07c9b6f. C012 and C130 work is built, not live and not enabled (cells keep their earlier done proof). Plan total now 161 (FACTORY_PLAN.md). Host at a517d106; sync asked of Victoria (owner-registry check first for #1816). Changes: C157 built→done. Cells now 81 done · 34 built, not live · 14 in progress · 14 not started · 18 deferred (161). Host PAUSED, productionWrites=false.

18 Oct 2026 7:08 AM ET update (Liora). 0655 launcher batch. Merged on factory-bridge main (squash pinned to green heads, 5/5): #1819 C157 fix round (malformed /work/[id] → proxy 400 invalid-record, no rewrite) → 10bc5506; #1818 C082 test pin → a517d106 (no served change). Closed red, fix rounds queued: #1817 C099 test pin (infra-multi flake, TP28F) and #1820 C144 System family mvp (/work payload +131 B over budget, FR51F). Catch-up from my own records (merged earlier, board not yet marked): C010 FR48F #1813 and C027 FR19 #1769 are built, not live. Host at 2f4837f8; sync + C157 re-probe asked of Victoria for a517d106. Changes: C157 wip→built C010 todo→built C027 todo→built. Cells now 80 done · 35 built, not live · 14 in progress · 14 not started · 18 deferred (161). Host PAUSED, productionWrites=false.

17 Oct 2026 7:50 PM ET update (Liora). Eve OK (eve-to-liora 1846) on Victoria's 6:26 PM ET C012 window proof (office-file-server/bot-work/victoria/probes/2026-10-17e/1828_ET_PROOF_C012_window.md: 2 TEST PROJECT records on Daniel's session, anonymous 401, idempotent replay, third record 409, self-build not called, flags restored, PAUSED and productionWrites=false after, snapshot first). C012 is done (live-proven in that window; switched off by design under the write lock). FR46 bot-write add-on stays under the same cell and does not hold the flip. Merged on factory-bridge main, built, not live until the next host sync and probe: #1795 C109 (Eve PASS), #1799 C105 (Eve PASS; the route still needs an entry link, brief FR47 queued), #1805 C110, #1806 (support inbox honesty line; brief labelled C114 but the surface is /support, so no C114 change). Held for Eve: #1804 C107, #1807 C130 (FR45). Changes: C012 built→done C109 wip→built. Cells now 80 done · 32 built, not live · 15 in progress · 16 not started · 18 deferred (161). Host PAUSED, productionWrites=false.

16 Oct 2026 7:10 PM ET update (Liora). Eve ordered 11 cells to done on Victoria's 4:34 PM served-site proof (host @ c3699fe6): C023 C083 C088 C094 C128 C129 C132 C156 C159 C160 C161. C157 stays in progress (probe returned 500 on a malformed id; builder fix queued). Merged tonight: #1747 C110 and #1748 C106 (Eve PASS, pinned heads), #1751 C144 and #1753 C137; all four are built, not live until the next host sync and probe. Changes: C023 built→done C083 todo→done C088 wip→done C094 built→done C128 wip→done C129 todo→done C132 todo→done C156 built→done C159 wip→done C160 wip→done C161 wip→done C106 wip→built C110 wip→built. Cells now 79 done · 32 built, not live · 16 in progress · 16 not started · 18 deferred (161).

Done means live — no new green. Done stays 68. Merged on factory-bridge main and verified on GitHub (main tip 64a150eb) but with no served-site probe, so built, not live: C146 #1721, C144 #1722, C046 #1716, C138 #1723, C097 #1724, C115 #1725, C155 #1728, C116 #1730, C121 #1731, C122 #1732, C123 #1733, C158 #1715, C012 #1711/#1717, C034 #1710/#1718, C137 #1712/#1719/#1531, C133 #1531, C018 #1690, C105 slice 4 #1709 (slice only). Write-path WP chain (#1375 #1377 #1381 #1387 #1531) merged; plan items, not roadmap cells. Open drafts (in progress): C106 #1726, C109 #1727, C110 #1729; builders running for C025 C090 C125. Host not yet synced to main tip; 9 data cells last probed UNAVAILABLE (0 live). Cells now 68 done · 33 built, not live · 23 in progress · 19 not started · 18 deferred (161). Changes: C012 todo→built C018 todo→built C025 defer→wip C034 todo→built C046 todo→built C090 defer→wip C097 defer→built C105 defer→built C106 defer→wip C109 defer→wip C110 defer→wip C115 defer→built C116 defer→built C121 defer→built C122 defer→built C123 defer→built C125 defer→wip C133 todo→built C137 todo→built C138 defer→built C144 defer→built C146 defer→built C155 defer→built C158 todo→built. Host PAUSED, productionWrites=false.

Updated Tuesday 13 Oct 2026, about 2:05 PM ET (newest note first; older notes below are unchanged)

Done means live — no new green. factory-bridge merged 15 cell PRs since the last board (#1618 #1619 #1620 #1621 #1626 #1627 #1628 #1629 #1630 #1633 #1636 #1637 #1638 #1639 #1640). None has a Victoria served-site probe yet (latest probe: 12 Oct 11:34 PM ET), so they are built, not live (orange), not done. Open draft builds are in progress (C029 #1634, C042 #1635, C006 #1632, C044 #1631, C061 #1622, C095 follow-up #1625, C096 #1623). Changes: C006 todo→wip C022 todo→built C023 todo→built C039 todo→built C042 todo→wip C047 todo→built C056 wip→built C057 wip→built C058 wip→built C061 todo→wip C072 todo→built C074 wip→built C078 todo→built C094 todo→built C095 todo→built C103 wip→built C104 wip→built. New rows C156–C161 (GPT external feedback) added under HOME TRUST: C156 built, not live (#1640); C157 C159 C160 C161 in progress; C158 held (not started). Cells now 68 done · 15 built, not live · 17 in progress · 26 not started · 35 deferred (161). Host stays PAUSED, productionWrites=false; pillars unchanged.

Updated Tuesday 13 Oct 2026, about 8:05 AM ET (newest note first; older notes below are unchanged)

9 weak cells → done live: Eve reviewed Victoria's 2026-10-12 probe (office-file-server/bot-inbox/eve-to-liora/2026-10-13_0658_ET_EVE_REVIEW_9cells_live_and_FACTORY_PLAN.md) and APPROVED all 9 to LIVE. Liora flipped C005 C016 C020 C031 C055 C060 C063 C066 C084 built→done. Proof: HTTP 200, real rows, host d078b3c5 = main, screenshots under office-file-server/bot-work/victoria/probes/2026-10-12/. Empty-page WIP cells (C044 C052 C053 C056 C057 C058 C074 C103 C104) untouched. Cells now 68 done · 0 built, not live · 16 in progress · 36 not started · 35 deferred (155). CSS .pbar.built kept (count 0). FACTORY_PLAN.md co-sign edits applied; STATUS still DRAFT pending Daniel via Aurora.

Updated Monday 12 Oct 2026, about 10:40 PM ET (newest note first; older notes below are unchanged)

Done means live: Daniel approved Eve's cell-verify items at 10:33 PM ET (Eve office-file-server/bot-inbox/eve-to-aurora/2026-10-12_2230_ET_CELL_VERIFY.md). 9 empty-page cells go back to in progress until real non-fixture rows show: C044 C052 C053 C056 C057 C058 C074 C103 C104. 9 weak-probe cells are relabelled built, not live (orange bar; on main, not live-proven; host still behind main): C005 C016 C020 C031 C055 C060 C063 C066 C084. Eve verifies after a Victoria re-probe. Cells now 59 done · 9 built, not live · 16 in progress · 36 not started · 35 deferred (155). Factory HOLD (since 12 Oct 9:14 AM ET) is still on: no builder launches, no merges. Host stays PAUSED, productionWrites=false; pillars unchanged.

Updated Saturday 10 Oct 2026, 1:55 PM ET (newest note first; older notes below are unchanged)

Done means live: host synced to main 4d66b152 (#1613; wave 2 #1575 #1590 #1594 #1612 #1613) and served-site probe by Victoria, 1:55 PM ET (proof office-file-server/bot-work/victoria/probes/2026-10-10/1355_ET_PROOF_wave2_sync.md). 2 cells flip: C053 Visual Concepts (honest empty state) and C103 Customer 360 (now fail-closed 200 with not-stored state; was deferred). Not green: C048 Decisions, C049 Knowledge & Evidence, C050 Blueprint Review: these boards only show for a CONCEPT-stage record, the host has none, and there is no empty state. Cells then 77 done · 7 in progress · 36 not started · 35 deferred (155) (recounted 13 Oct 2026 ~8:05 AM ET: 68 done · 0 built, not live · 16 in progress · 36 not started · 35 deferred; see 13 Oct note; 12 Oct was 59 done · 9 built, not live · 16 in progress · 36 not started · 35 deferred). Host stays PAUSED, productionWrites=false; pillars unchanged.

Done means live: host synced to main 82cc77f4 (#1593; merge wave #1580–#1611) and served-site probe by Victoria, 12:12 PM ET (proof office-file-server/bot-work/victoria/probes/2026-10-10/1212_ET_PROOF_merge_wave_sync.md). 27 cells PASSED; C009 was already green, so 26 flip: C007 C008 C011 C021 C033 C044 C052 C056 C057 C058 C059 C067 C068 C069 C073 C074 C075 C076 C080 C085 C089 C098 C104 C107 C124 C134. Empty-state fixes C044 C052 C057 C074 now PASS (honest UNAVAILABLE/no-data markers). Some flipped cells were marked deferred before (they shipped anyway). Not green: C103 Customer 360 (route returns 404 because the host has no recorded customer to show; entry link is there). Cells now 75 done · 7 in progress · 37 not started · 36 deferred (155). Host stays PAUSED, productionWrites=false; pillars unchanged.

Updated Friday 9 Oct 2026, 9:19 PM ET (newest note first; older notes below are unchanged)

Done means live: served-site re-probe on host @ 7b7c00a0 (Victoria, 9:19 PM ET; proof office-file-server/bot-work/victoria/probes/2026-10-09/2119_ET_PROOF_reprobe_post_rollback.md) PASSED 12 cells; 11 counted: C003 C005 C009 C016 C020 C031 C055 C060 C063 C066 C084. C003 was already green, so 10 cells flip. C128 not counted: probe covered /work job panel, not the adapter contract. Cells now 49 done · 11 in progress · 55 not started · 40 deferred (155). Still not green: C044 C052 C053 C057 C074 (probe FAIL) and C056 C067 C068 (merged, not on host, not probed). Host stays PAUSED, productionWrites=false; pillars unchanged.

Updated Tuesday 6 Oct 2026, 8:30 PM ET (newest note first; older notes below are unchanged)

Honest update for Daniel. The Factory keepers merged a large batch of reviewed drafts today. Most of that work is honesty, fail-closed labels, recorded-mode health strings, badges and tests. Those do not turn roadmap cells or pillars green. Prefer understating over greening. Actual dollars spent are not available to me, so I show none.

Update, Tuesday 6 Oct 2026, about 8:30 PM ET

Progress since the Monday 5 Oct 9:10 AM ET note. What changed in operations; what did not change in product capability.

Cell recount (6 Oct, from product evidence, not merge count): I re-counted every roadmap bar on this page and checked the product gates that would allow a cell to turn green (host serving real GET /jobs and GET /decisions rows; evidence-backed money meter; host tip-sync of a current tip; money lane open; a customer-facing product shipped; intake API switched on; live production writes on the host). None of those gates are met. Counts stay 39 done · 15 in progress · 61 not started · 40 deferred (155 cells). Family subtotals unchanged. No bar flipped to green. Pillars stay yellow / red — nothing green.

Unchanged on purpose: no pillar green · host PAUSED · money lane declined · host/deploy locked · Home zones that need live job/decision rows still show UNAVAILABLE · Cost meter still unavailable · Idea-to-software and Operate-and-upgrade still red. Docs, tests, fail-closed copy, badges and health-string PRs do not move product pillars to green.

Updated Monday 5 Oct 2026, 9:10 AM ET (the newest note is first; the older text further down was first added overnight, Thursday 1 Oct 2026, by Liora, and is as of 12:05 AM ET Fri 2 Oct; boxes below this one are unchanged)

The Factory is still PAUSED, production writes are off, drafts only, and the money lane is declined. Standing locks apply. All of the work below is documents or tests. Every change Eve checked was approved before it merged. Actual dollars spent are not available to me, so I show none. No bar, status or percentage on this page moved — docs and tests do not turn cells green.

Update, Monday 5 Oct 2026, about 9:10 AM ET

Progress since the Saturday 3 Oct 10:58 AM ET note (the last time the menu bars were left alone on purpose). All of this is documents or tests unless noted. Nothing changed in how the Factory runs.

Unchanged: Factory PAUSED · productionWrites=false · drafts only · money lane declined · standing locks apply. No unpause and no new kind of write. No bar, status or percentage on this page changed with this update, and nothing is green.

Update, Saturday 3 Oct 2026, about 11:55 PM ET

Since the 10:58 AM note below, 64 more changes merged into the Factory's main record, from #743 to #806, between 11:22 AM and 10:46 PM ET. That makes 93 merged today (since midnight ET). Eve (the independent checker) approved each of the 64 at the exact version that merged, and each was squash-merged. The newest main record is now at 98364f89 (#806).

Honest note: the tests and documents above were reviewed in the docs-only or tests-only lane and are not counted as CI-green. #779 is the only change in this group that touches the app's source code. Actual spend: unavailable, so I show no figure.

Still open: 18 draft pull requests as of about 11:45 PM ET. Thirteen are older parked drafts (#714, #506, #497, #480, #425, #238, #234, #190, #156, #60, #31, #28 and #1). Five are new test and document drafts (#807 to #811) that are waiting for Eve's review. Two source-fix drafts are expected next; they are not open yet.

Unchanged: the Factory is still PAUSED, production writes are off, and only draft pull requests are used. There was no unpause and no new kind of write. No bar, status or percentage on this page changed with this update, and nothing is green. The items under "Not done yet, plainly" below, and what is waiting on Daniel, stay as they are.

Update, Saturday 3 Oct 2026, about 10:58 AM ET

Nine more small test and document changes merged into the Factory's main record since the 9:00 AM note below. Each one was approved by Eve (the independent checker) at the exact version that merged, and each was squash-merged into the Factory's main record. Nothing changed in how the Factory runs.

Honest note: one automatic check on #737 failed once on an unrelated timing test, and passed on a re-run with no code change. More small test and document tasks are queued and are being checked by Eve before they merge.

Unchanged: the Factory is still PAUSED, production writes are off, and only draft pull requests are used. Spend is well under the $200 a day cap. There was no unpause and no new kind of write. No bar, status or percentage on this page changed with this update, and nothing is green. The items under "Not done yet, plainly" below, and what is waiting on Daniel, stay as they are.

Older note, as of about 9:00 AM ET Sat 3 Oct: Update, Saturday 3 Oct 2026, about 9:00 AM ET

Eight more small test and document changes merged into the Factory's main record this morning. Each one was approved by Eve (the independent checker) at the exact version that merged. Nothing changed in how the Factory runs.

Earlier overnight, two document changes merged at about 1:47 to 1:50 AM ET on Sat 3 Oct: #724 (merge evidence, part 3B) and #725 (the list of gaps in direct tests for the shared library).

Honest note: the work stalled overnight from about 2:22 AM to 8:06 AM ET, roughly 5 hours 45 minutes of nothing happening, because the manager bot's wake-up chain stopped. The stop alert caught it at 8:06 AM and it was restarted. Nothing was lost.

Unchanged: the Factory is still PAUSED, production writes are off, and only draft pull requests are used. Spend is well under the $200 a day cap. There was no unpause and no new kind of write. No bar, status or percentage on this page changed with this update, and nothing is green. The items under "Not done yet, plainly" below, and what is waiting on Daniel, stay as they are.

Older note, as of 12:05 AM ET Fri 2 Oct (unchanged text follows)

Merged tonight (3)

Found and being fixed

The Home Money tile shows a made-up "$0 spent" because the local test bridge hard-codes it. A fix is built as a draft so it shows "unavailable" instead. It is being checked and needs Eve's approval before it merges. It changes nothing on the live host until a reviewed, tested redeploy.

In review, not merged yet

Not done yet, plainly

No pillar is green. The 24-hour goal is not met. More real work needs Daniel's yes on Q9 (read-only intake feed), Q5 (both 10-minute limits to 20) and Q15 (slow load test fails fast). The earlier waits on Daniel, Victoria and Celeste are unchanged.

WHERE WE STAND NOW (19 Oct 2026): THE BARS

Five pillars. Colour is the honest rating from the Factory plan. Bars are not percentages; nothing is green.

1 Crash-proof base
YELLOW
Partly live; waiting on Daniel (CI file, 20-minute limits, branch rule)
2 Trusted Home
YELLOW
Waiting on Daniel Q1 yes and Victoria; stays yellow until real job rows exist
3 Idea-to-software
RED
Needs one product on the template and a real release flow
4 Operate-and-upgrade
RED
Needs intake API, cost meter, measurements
5 Worldwide serving
YELLOW
Blocked on Victoria, Celeste, pager route

Roadmap cells by menu family (current: 19 Oct 2026, ~12:10 AM ET recount). Green is done (live-proven), orange built, not live, amber in progress, grey not started, dark grey deferred. 84 done, 34 built, not live, 13 in progress, 12 not started, 18 deferred (161 cells), counted per family from the roadmap grid below; the per-family bars add up to these totals. Since the 13 Oct recount (68/15/17/26/35) and 18 Oct (81 done): C041, C061, C133 are done; C030 stays built, not live. No green without proof; prefer understating over greening. See the 19 Oct note at the top of this page.

CONTROL
24 done · 6 built, not live · 3 in progress · 1 not started · 3 deferred (37 cells)
DISCOVER
4 done · 6 built, not live · 5 in progress · 7 not started · 0 deferred (22 cells)
BUILD
19 done · 3 built, not live · 1 in progress · 1 not started · 3 deferred (27 cells)
OPERATE
7 done · 2 built, not live · 2 in progress · 2 not started · 2 deferred (15 cells)
CUSTOMERS
2 done · 4 built, not live · 0 in progress · 0 not started · 0 deferred (6 cells)
COMMERCIAL
6 done · 4 built, not live · 0 in progress · 0 not started · 3 deferred (13 cells)
COST
1 done · 3 built, not live · 1 in progress · 0 not started · 0 deferred (5 cells)
PLATFORM
10 done · 2 built, not live · 1 in progress · 0 not started · 3 deferred (16 cells)
SYSTEM
0 done · 1 built, not live · 0 in progress · 1 not started · 1 deferred (3 cells)
CROSS-CUTTING
6 done · 2 built, not live · 0 in progress · 0 not started · 3 deferred (11 cells)
HOME TRUST
5 done · 1 built, not live · 0 in progress · 0 not started · 0 deferred (6 cells)

Total: 84 of 161 cells done live (52%), plus 34 built, not live (21%), 13 in progress (8%), 12 not started (7%), 18 deferred (11%); of the 143 not deferred, 84 are done live (59%). Percentages = count / 161.

UPDATE 30 Sep 2026, 11:50 PM ET (added by Liora; everything below this box is the unchanged 28 Sep page)

Goal (Daniel): finish the Factory itself so it matches the v2.4 R4 prototype, every bar green, with real production behind it. No product work until the Factory is finished. The Factory takes an idea and turns it into software people around the world can use, solid and trusted.

Approach: AI-first with strong human control. Daniel keeps first launches, unpausing, production writes and any new kind of write. Agents can always pause or roll back.

Honest status: no pillar is green yet. Nothing has shipped to customers. Factory is PAUSED and production writes are off. The roadmap count on this page (39 of 115 live cells done) is the 28 Sep snapshot and has not been recounted.

Five pillars today

Three gaps being written down (new rows, no existing row removed)

Next steps in order

In review right now (docs only, nothing merged yet)

Q1 page (approved by Eve, merge about 7 AM), intake design page (approved by Eve, merge about 7 AM), standing rules and gaps page (Eve asked for edits, fixing from 7 AM).

Standing rules: batches to Eve or Celeste cover a full day of prepared work with one review per day; deep-dive requests only when a task is genuinely stuck. The 28 Sep rows below are kept as they were. The live in-app Roadmaps board still shows the old data until a code change lands.

WORK TO DATE, 28 Sep to 30 Sep 2026 (added by Liora, 11:55 PM ET; the 28 Sep page below is unchanged)

Everything here is finished and merged into the Factory's main record. All of it is documents, tests and read-only code. Nothing has been switched on in production, and nothing has shipped to customers. Counts come from the merge record; the actual dollars spent are not available to me, so I show none.

Waiting to merge about 7 AM (all docs, Eve decides)

Q1 page (approved), intake design (approved), standing rules and gaps (Eve asked for edits).

Not done yet, plainly

No pillar is green. Still waiting on Daniel: Q1 yes, land the CI file, the 10 to 20 minute limits, the branch rule, and the object names. Still waiting on Victoria: data source, token scope, pager route. Celeste: the cost threshold.

BIGFIT · Factory OS · build sequence by menu

Menus × Phase columns + status, next action, and dependencies

Each stage family is a block. Each row is one menu. Phase columns hold that menu’s blueprint tasks. Every task shows a Next move and dependency chips (← requires · → unlocks · ↔ couples · blocks). No invented work.

Updated 28 Sep 2026 ~17:05 EDTSources factory-bridge main 10e0dee0 (#537) · host at 97bdcb23 (#536) · PAUSED / writes falseMain tip 10e0dee0 (#537, docs only) · host app code = main after tip-sync #3 PASS 28 SepOS 75–86 DONE Products #116 @ b06390b#179 Conversation bar · #187 Integrations · #188 docs/nav · 162 Pages · factoryMode PAUSED · writes falseItem 8 deferred · Daniel secretWrite class factory.self_build.supervised · named only · no flipWrites false · PAUSED · client products parked · Director keys off host · Ellisbrook attach NO-GOPrevious snapshot · 26 Sep →← Status board
Phase 0
Baseline Control Room (PR #36).
Phase 1
After five freezes.
Phase 2
Thin FLOW-01/02 + Operate.
Later
Cost, Customers, Commercial, full gates.
Status
In PR #36 · Partial · Not started · Deferred.
Next
Short “what moves this forward / who.”
Bars
Green done (live-proven) · orange built, not live · amber in progress · grey not started.
Deps
Chips show requires / unlocks / couples / blocks.

Factory status — 28 Sep 2026 ~17:05 EDT

Roadmap cells (155): 39 done (25%) · 15 in progress · 61 not started · 40 deferred. Excluding deferred: 39/115 = 34% done; counting in-progress as half = ~40%. Since 26 Sep: 6 cells moved from not started to in progress, 1 new in-progress cell (Home ten-second zone scorecard), 0 new done. Changed cells carry a “28 Sep:” note.

Why nothing turned green: the Home zones are merged and live on the host, but the host bridge does not yet serve GET /jobs or GET /decisions, so Operations, Needs Daniel and Product Health honestly show UNAVAILABLE instead of sample data. Most other merges since 26 Sep were host hardening, speed work and docs, which deepen cells already counted.

Merged since 26 Sep (factory-bridge #472–#537): INFRA-01 follow-ups (scheduled backup + restore drill, health monitor, PAUSED redeploy script, Next 16, SSR speed trims, keyset pagination, test-only multi-instance runtime) · bridge adapter contract v1 (#508) · JOB-01 guards + bundle audit (#507, #509–#511) · Q41 speed budgets written (#512) · truth map, 2% boundary, Home spec, intake schema and FAIL-to-test runbook (docs, #513–#522) · doc-cite checker + docs CI lane (#518, #525) · Home PR slices 1–7 (#523, #524, #528, #531, #533, #534, #536 = spec slices 1–5, incl. Launches zone and Product Health zone with a TEMPORARY YELLOW cap) · docs slices 3–9 (to #537).

Host: operator tip-syncs on 28 Sep all PASS (to ce466dc3, da86cee5, then 97bdcb23 at ~16:12 EDT); rollback target recorded first each time; smoke PASS; monitor HEALTHY. Host app code = main (#537 is docs only). Served Home p95 ~374–383 ms over 100 signed-in rounds, well under the 2 s bar.

Daniel decisions 28 Sep: finish line = BIGFIT dashboards and software in full per v2.4 R4 and the Factory fully operational · JOB-01 acceptance bar approved as the first milestone only · C4 2% boundary approved (agents may tip-sync approved lanes at a reviewed, CI-green, QA-passed SHA with a receipt; first launch and unpausing production writes stay Daniel’s; agents may always pause or roll back) · Q41 speed accepted for Home only · product CI template spec cleared (template itself stays locked) · docs CI lane approved (#525).

Open / held: Home spec slice 6 needs the host bridge to serve GET /jobs + /decisions (then lift the YELLOW cap) · spec slice 7 paging not built · Money (M5 meter) and page-Daniel tiles UNAVAILABLE · auto tip-sync (413) and auto-rollback missing · private online address (tunnel + access control) pending from Victoria · #506 parked · #497 / #480 on hold.

Posture: FACTORY_MODE=PAUSED · productionWrites=false · Ellisbrook NO-GO. Main 10e0dee0 · host 97bdcb23. Previous snapshot: 26 Sep page.

Factory status — 26 Sep 2026 (previous) ~02:20 EDT

Roadmap cells (154): 39 done (25%) · 8 in progress (local-demo or partial versions) · 67 not started · 40 deferred. Excluding deferred: 39/114 = 34% done; counting in-progress as half = ~38%.

Approved build queue: everything approved through item #412 is merged (waves 12–16 RO/plain-language deepen, FLOW-01/02/03 Slices A–D, JOB-01 A–D, MAINT-01/02, UX-01, CL-1). Current packet INFRA-01 (#413–#438): 10 of 26 done (413, 414, 415, 417, 419, 420, 421, 426, 433, 437); 427 in final review.

Why the cell % moved little: the Sep 23–26 work deepened menus that were already marked done, or delivered LOCAL DEMO versions of later cells. A cell only turns green when it works for real, not as a demo.

Posture: FACTORY_MODE=PAUSED · productionWrites=false · Ellisbrook NO-GO. Main 88270d9f. Host not yet redeployed with INFRA-01 changes.

Factory status — 23 Sep 2026 (older) ~17:55 EDT

Posture: FACTORY_MODE=PAUSED · productionWrites=false · Ellisbrook/client NO-GO · RO deepen only (no mutate / no live state) · Director keys off host.

Accepted queue: 233 DONE · 3 IN PROGRESS (#343 FLOW-01 · #344 FLOW-02 · #345 FLOW-03 wave-13 / W16-START) · 6 stale OPEN (superseded wave closers) · ~70 approved remaining through item #412.

Software tip: liboriodsantos/factory-bridge a46c9cb7 (Merge #365 — item 342 host tip-sync + Pages honesty pack). W15-START CLOSED (#341 Docs/nav #366 · #342 tip-sync #365). Host tip-sync still NOT DONE (OPERATOR_BOX_MUST_RUN / SSH_MISSING). Next: W16-START FLOW wave-13 RO deepen.

Builders: up to 3 concurrent Cursor cloud agents under Aurora gates (composer-2.5, fast=false, under per-agent and daily spend caps). Pages honesty + host tip-sync still need operator box when queued.

Cost tracking per menu — what’s possible now

In the blueprint: Cost family (Costs & Vendors), Budget/Actual/Committed/Forecast/Variance, AI cost drill, and Home “spend” on the status strip. Command schema includes budget/credit ceilings.

What exists in software today:

Practical next step for cost: keep Home spend as UNAVAILABLE until evidence-backed metering exists. Per-menu cost columns wait for Costs & Vendors Phase (Later) plus run/token metering from Work / AI & Models.

Implementation path when we do Cost: (1) extend Bridge health with optional spend evidence object; (2) add Cost ledger records in Factory DB; (3) attribute via commandId/runId/productId — not by menu label alone; (4) menus show rollups only. Cursor subscription usage and DigitalOcean invoices stay outside Factory OS unless we import them as Vendor cost lines.

CONTROL

DISCOVER

BUILD

OPERATE

CUSTOMERS

COMMERCIAL

COST

PLATFORM

SYSTEM

CROSS-CUTTING

HOME TRUST (added 13 Oct, C156–C161)

Critical path (dependency spine)

  1. Bridge adapter schemas (Integrations / Platform) — blocks Home KPI truth, Decision Bridge packet, Work LIVE FACTORY. 28 Sep: contract v1 merged (#508); host bridge still returns 404 for GET /jobs and /decisions, which keeps three Home zones UNAVAILABLE.
  2. Status vocab + typed Decision — blocks Decision Inbox Phase 1 and Change Queue.
  3. ConceptionProject / ImplementationProject rename — blocks Discover/Build object spine.
  4. Decision → evidence → receipt — unlocks Work ledger and FLOW-01/02 thin.
  5. Delivery ← Blueprint Execution Package — unlocks Releases; production promote stays Later. Write class factory.self_build.supervised is named only — no expansion.
  6. Cost / Customers / Commercial / geography / agents-as-actors — Later; do not put fake dollars or city KPIs on early menus.

Tasks/next/deps from Post-R3 §§7–37 + Journeys, Audit inventory, factory-bridge main, Factory OS items 45–94 MERGED; factory-bridge 95–105 software DONE incl 103 @ 2e31aca; 107–114 RO deepens DONE on main; host tip 115 DONE @ 4375131 (includes #139 / #141); wave-3 143–161 DONE on main @ 36264636; 162 host tip-sync DONE @ 36264636 (evidence 162_HOST_TIP_SYNC_20260921T020021Z.md); 117–142 not invented. Docs gaps labeled. Factory OS 45–94: Pages 37–43 already live (45, this repo #17 @ fb84e26) · Discover deepen DONE (46–48, #87) · Evidence deepen DONE (49–50, #86) · Integrations deepen DONE (51–52, #88) · Home NBA DONE (53, #85) · Portfolio+Work DONE (54, #89) · Teams DONE (55, #90) · FLOW-01..04 DONE (56–59, #91–#94) · Discover universal record DONE (60, #95) · Evidence universal record DONE (61, #97) · Decision Inbox DONE (62, #98) · conversation bar DONE (63, #96) · Home strip DONE (64, #99) · Work→receipt DONE (65, #100) · host smoke/ceremony 68/73 PASS · nav 72 @ 6f66f6f · write-class 71 @ 24dca85 (docs only · no flip) · 74 tip sync DONE @ 3a0b39388d0dbafd0a8b31355b0a21bfaf4fef99 (includes #117–#124 · 74c) · 70 DONE (host tip current with post-#124 main @ 3a0b393 · evidence 74c) · Environments 75 #105 @ 80b1cfb · Monitoring 76 #106 @ 15eb0af (FLOW03-EV-MONITORING dedupe) · Incidents 77 #104 @ 91c091a · Improvement 78 #107 @ 1c46ca5 · Sales 79 #108 @ 9285da8 · Quotes 80 #109 @ 6033a2b · Customers 81 #111 @ eca85b3 · Margin 82 #112 @ 9c66122 · Delivery 83 #113 @ c0fe95a · Releases 84 #114 @ 0ec4c3d · Roadmaps 85 #115 @ 9659603 · Products 86 #116 @ b06390b · #117–#124 MERGED (Actions billing unblocked; merge-when-green completed). Merge SHAs not readable from this Pages token — not invented. Host tip sync to post-#124 main DONE @ 3a0b393 (74c): Teams #117 (87) · Integrations #118 PLATFORM-EV-INTEGRATIONS (88) · FLOW02 Actor #119 (89) · FLOW03 Impact #120 FLOW03-IMPACT-GATE (90) · FLOW04 Contract #121 FLOW04-EV-CONTRACT-GATE (91) · conversation-bar +2 RO #122 (92) · Home NBA third pack #123 home-nba (93) · docs/nav sync #124 (94) · #125–#131 Operate through Home NBA fourth pack MERGED · #133 nav sync MERGED · tip 3cf676f (Merge #133) · host tip-sync 105 PASS · item 103 Factory Health strip DONE @ 2e31aca · host tip-sync follow-up DONE @ 2e31aca41854c84b28d2b4ba0fbdddf6c5e91d5a (includes #132) · Pages 106 already live · 107–114 RO deepens DONE · 112 Releases #139 · 113 Portfolio/Work · 114 nav #141 · 115 tip DONE @ 4375131 · 116 already live · wave-3 143–161 DONE @ 36264636 · 162 host tip-sync DONE @ 36264636 · 117–142 not invented · item 8 still deferred (Daniel secret) · docs #101 · #110 on main (briefed; subject/SHA not in this brief). 33/36 closed via later 54/59. Overnight software PR numbers #85–#101 from Daniel’s item-67 brief; item 69/71 SHAs from the follow-up brief; factory-bridge not reachable here. Write class factory.self_build.supervised named only — no expansion / no flip / no new write class. factoryMode=PAUSED. productionWrites=false. Client products parked. Director keys off host. Ellisbrook / client product tracks NO-GO. 28 Sep 2026 update: sources = factory-bridge main 10e0dee0 (#537), merged PRs #472–#537 read via the GitHub API, PRODUCT_TRUTH_MAP.md and FACTORY_HOME_SPEC_PROPOSED.md at main, host tip-sync #3 receipt (host 97bdcb23). Counts are scripted from the cell classes on this page. 26 Sep version: build-roadmap-2026-09-26.html.